Sunday, October 23, 2016

For Kate A To Do List

For Kate A To Do List


Heres what weve accomplished so far this week:

-last round of mudding in the basement;
-last round of sanding in the basement;
-repaired all the upstairs drywall cracks from the delivery and set;
-trimmed the excess deck cable and mounted the finish hardware;
-installed the kitchen faucet, sink trap and garbage disposal;
-installed dishwasher;
-installed the under-cabinet lighting;
-installed all the cabinet hardware;
-installed a new outlet behind the stove (house came with a 220 outlet for an electric range, but we changed to gas and needed a 120); and
-started painting.

Heres a rough list of whats left:

-I havent yet done a thing in the basement bathroom, and the small bedroom in the basement is basically a storage closet right now, so its drywall hasnt been mudded or taped;
-all the basement doors need to be hung;
-w/d need to be installed;
-we need to figure out what were doing about a closet system in the basement;
-bamboo treads and risers and the bamboo on the landing;
-basement trim;
-finish matls for the basement recessed lights and we still need to find a pendant light for above the dining table;
-cement board and remaining couple of pieces of cedar trim;
-outdoor speakers;
-basement media (tv, satellite, audio system);
-finish coat of paint; and
-Im sure lots of little things that well figure out as we go.


For Kate A To Do List